1 |
Shed Silo System: |
2 |
1. Control board servicing and checking & Modification (if required). |
3 |
2.Feed Column Cover Remove. |
4 |
3.Feed Column Cover Clean. |
5 |
4.Feed Column Cover Resetting. |
6 |
5.Feed leveler Remove & Clean. |
7 |
6.Feed leveler Resetting. |
8 |
7. Motor Remove & Clean. |
9 |
8. Motor Checking & servicing. |
10 |
9. Motor Re- Setting. |
11 |
10.Silo Scrow auger Remove & Clean. |
12 |
11.Silo Scrow auger Re-Setting. |
13 |
12.Silo Scrow auger Bush Remove & Clean. |
14 |
13. Load cell Control Board setting. |
15 |
Indrustrial Socket setting. |
|
14. Load cell control junction box setting. |
16 |
14. Load cell servicing & connection checking. |
17 |
15. Sensor servicing & connection checking. |
18 |
16.Silo Culler Checking & Change. |
19 |
17. Earthing line servicing & connection checking. |
20 |
18. Wiring Pipe Checking & Maintenance. |
21 |
Chain feeding system: |
22 |
1. Control board servicing & checking & Modification (if required). |
23 |
2.Cover for Drive gear reversible Remove . |
|
2.Cover for Drive gear reversible Clean. |
24 |
3.Cover for Drive gear reversible Resetting. |
25 |
4.Drive gear reversible Remove . |
|
4.Drive gear reversible Clean. |
26 |
5.Drive gear reversible Re-Setting. |
27 |
6. Guide Plate Remove & Clean. |
28 |
7. Guide Plate Re setting. |
29 |
8.90* Corner Checking & Cleaning. |
|
8.90* Corner Cover Remove & Clean. |
30 |
9.90* Corner Clean & Repair. |
31 |
10.Feed Motor Clean & Polithin Raping. |
32 |
11.Feed Motor Checking & Vernished. |
33 |
12.Feed Motor Geass & Re-oiling. |
34 |
13.Feed Motor Re Setting. |
35 |
14.Feed Trough and joint, servicing & checking. |
36 |
15.Feed Trough Changing. |
37 |
16.Feed Chain Cutting. |
38 |
17.Feed Chain Hanging. |
40 |
19.Feed Chain Resetting. |
41 |
20.Earthing line servicing & checking. |
42 |
21. Feed column checking & maintenance. |
43 |
22.90* Corner Wheel Remove. |
44 |
23.90* Corner Wheel Clean. |
45 |
24.90* Corner Wheel Resetting. |
46 |
25. Single line Diagram Same to control Board Checking. |
47 |
26. Wiring Pipe Checking & Maintenance. |
48 |
27. Earthing connection checking and re-Tightening. |
49 |
Nipple drinking system: |
50 |
1. Nipple line flashing and nipple checking. |
51 |
2. Ball tank servicing & checking. |
52 |
3. Water supply line checking and cleaning. |
53 |
4. Filtering system servicing & checking. |
54 |
5. Medication system New setting As per drowning. |
55 |
6. Water mater checking & servicing. |
56 |
7. Drain out system servicing & checking. |
57 |
8. Shocking line new installation. |
58 |
Ventilation System: |
59 |
1. Control board servicing , Checking & Maintenance & Modification(if required). |
60 |
2. Earthing Connection. Servicing, Checking & Maintenance. |
61 |
3. Fan Motor Remove |
62 |
3. Fan Motor cleaning. |
63 |
4.Fan Motor Vernished & Maintenance. |
64 |
5. Fan Motor Re setting. |
65 |
6. Fan belt Change. |
66 |
7. Fan side MCB Breaker Checking & Maintenance. |
67 |
. Fan side MCB Breaker Remove. |
68 |
. Fan side MCB Breaker cleaning. |
67 |
8. MCB Box Checking & Maintenance. |
68 |
9. Fan shutter Checking & Maintenance. |
69 |
10. Propeller bearing Checking & Maintenance. |
70 |
11. Motor base plate Checking & Maintenance. |
71 |
12. Motor Pulley Remove, |
72 |
13 Motor Pulley ,cleaning . |
72 |
13. Fan Pulley Remove,cleaning. |
73 |
14.Motor Pulley Re setting. |
74 |
15.Fan Pulley Re setting. |
75 |
16.Fan Body Checking & Maintenance. |
76 |
17.Motor RPM Checking. |
77 |
18.Propeller RPM Checking. |
78 |
19.Out side Penal board Indicating lamp Checking & Maintenance. |
79 |
20. In side Indicating lamp Checking &Maintenance. |
80 |
21. Single line Diagram Same to control Board Checking. |
81 |
22. Wiring Pipe Checking & Maintenance. |
82 |
MDB: |
83 |
1. Control board servicing , Checking & Maintenance & Modification (if required). |
84 |
2. Volt Meter Checking & Maintenance. |
85 |
3. Volt Meter Switch Checking & Maintenance. |
86 |
5. Wiring Pipe Checking & Maintenance. |
87 |
6. Earthing line servicing & checking. |
88 |
Machine Lay-Out: |
89 |
1. Machine Lay-Out Checking. |
90 |
1. Machine Lay-Out Marking |
91 |
1. Machine Lay-Out setting. |
92 |
2. New machine lay-out making & setting. |
91 |
Surge Protector : |
92 |
1. Surge protector Connection Setting. |
93 |
1. Surge protector Control board Setting. |
95 |
1.New Earthing Boaring installation. |
93 |
2. New Earthing Installation. |
94 |
3. Earthing line servicing, checking & Maintenance. |
95 |
Side curtain: |
97 |
Side curtain wood remove. |
98 |
Mini curtain Wood remove. |
|
Mini curtain remove. |
99 |
1.Side Curtain Clean. |
100 |
2.Curtain servicing, checking and repairing. |
101 |
3.Winching system servicing and checking. |
102 |
4.New Mini-curtain setting. |
103 |
5.Mini-curtain servicing & checking. |
104 |
6.Leakage checking and repairing. |
105 |
7.Wood Checking & Setting. |
106 |
8.Plastic rope Checking & Maintenance. |
107 |
9.Steel wire Checking & Maintenance. |
108 |
10.Pulley Checking & Maintenance. |
109 |
11. Side curtain Hanging Pipe Checking &Maintenance. |
110 |
12.Cross rope Checking & Maintenance. |
111 |
13. Side Curtain Pocket Checking & Maintenance. |
112 |
EC system: |
113 |
1. Pad Remove, |
114 |
1. Pad Remove,cleaning. |
115 |
1. Pad Remove,Drying |
116 |
2. Pad Re setting. |
117 |
3. Frame and pipe servicing and repairing. |
118 |
4.Drip Trough Cleaning & Repair. |
119 |
5.Pad holder Cleaning & Checking. |
120 |
6. Leakage checking and repairing. |
121 |
7. Earthing line servicing & checking. |
122 |
8. Floating switch Checking & Maintenance. |
123 |
9. End Cap Checking & Maintenance. |
124 |
10. Wiring Pipe Checking & Maintenance. |
125 |
11.Motor Remove & Clean. |
126 |
12.Motor Checking & Vernished. |
127 |
13.E/C water Checking & Clean. |
128 |
14.D/O NET REMOVE. |
129 |
15.D/O NET CLEAN. |
130 |
16.D/O NET RESETTING. |
131 |
17..E/c water line extension. |
132 |
Lighting system: |
133 |
1.Control board servicing & checking & Modification (if required). |
134 |
2.Electrical line servicing, checking and Repairing. |
135 |
3.Holder Checking & Maintenance. |
136 |
4.Wiring Pipe Checking & Maintenance. |
137 |
5.Light Remove,cleaning. |
138 |
6.Light Resetting. |
139 |
7.Light holder Clean & Plastic Wrapping |
140 |
8.Light holder Resetting. |
141 |
Shed alarming system: |
142 |
1.Control board servicing & checking & Modification (if required) |
143 |
2.Electrical line servicing,checking and Repairing. |
144 |
3.Battery servicing and checking. |
145 |
4.Horn and flash light servicing and checking. |
146 |
5.Earthing line servicing & checking. |
147 |
False Ceiling: |
148 |
1.False ceiling washing. |
149 |
2.False ceiling sheet checking & repairing. |
150 |
3.False Ceiling Changing. |
151 |
4.GI wire checking & repairing. |
152 |
5.Leakage checking and repairing. |
153 |
6.Truss gape sealing by silicon gum. |
154 |
Gate Silo System. |
155 |
1.Control board servicing and checking & Modification (if-required). |
156 |
2.Silo Motor Remove & Clean. |
|
2.Silo Unloader Remove & Clean. |
|
2.Silo Distribution pipe Remove & Clean. |
|
2.Silo auger Remove & Clean. |
157 |
3.Motor servicing and checking. |
158 |
4.Silo Motor Re setting. |
159 |
5.Band pipe & Distribution pipe Clean |
160 |
6.Silo cleaning, nut-bolt checking and painting. |
161 |
7.Auger-flex-flow auger cleaning & checking. |
162 |
8.Auger-flex-flow auger Re setting. |
163 |
9.Load cell servicing & checking, |
164 |
10.Earthing connection checking and re-Tightening. |
165 |
Security Lighting System: |
166 |
1.Light servicing and checking. |
167 |
2.Electrical wiring checking and repairing. |
168 |
3.Pole earthing checking and repairing. |
169 |
4.New Security line Installation. |
170 |
CCTV System: |
171 |
1.Camera checking & maintenance. |
172 |
2.Net working system checking & maintenance. |
173 |
3.Cable and connection checking &Maintenance. |
174 |
4.Power supply unit checking & countenance. |
175 |
5.Server checking & maintenance. |
176 |
Shower room: |
177 |
1.Control board servicing & checking & Modification (if required). |
178 |
2.Electrical line servicing & checking. |
179 |
3.Limit switches servicing and checking. |
180 |
4.Solenoid valve servicing & checking. |
181 |
6.Pumps servicing and checking. |
182 |
7.Plumbing system servicing & checking. |
183 |
8.New Earthing Connection. |
184 |
9.Earthing line servicing & checking. |
185 |
LT Line: |
186 |
1.PG clamps checking and servicing. |
187 |
2.New U-clamp setting . |
188 |
3.Service cable checking and servicing. |
189 |
3.All jumper checking & servicing. |
190 |
4.Guy & insulator checking & servicing. |
191 |
5.Earthing line checking & servicing. |
192 |
HT Line: |
193 |
1.DOF checking & servicing. |
194 |
2.LA checking & servicing. |
195 |
3.HT cable checking and servicing. |
196 |
4.Isolator checking & servicing. |
197 |
5.Earthing line checking & servicing. |
198 |
Sub-Station equipment: |
199 |
1.Change over switch checking & servicing. |
200 |
2.Change over switch. |
201 |
2.LT switch gear checking & servicing. |
202 |
3.PFI Plant checking & servicing. |
203 |
4.HT Panel checking & servicing. |
204 |
5.All cable checking and servicing. |
205 |
6.Generators checking & servicing. |
206 |
7.Transformer checking & servicing. |
207 |
8.Battery checking & servicing. |
208 |
9.Muffler checking & servicing. |
209 |
10.Alarm system checking & servicing. |
210 |
11.Cable trench & room servicing & cleaning. |
211 |
12.Diesel tank Clean. |
212 |
13.Radiator Clean. |
213 |
14.New By Pass Line making. |
214 |
15.Earthing line checking and servicing. |
215 |
Manager Bungalow: |
216 |
1.Electrical line checking & servicing. |
217 |
2.Electrical equipments checking & servicing. |
218 |
3.Earthing line checking & servicing. |
219 |
4.LA system checking & servicing. |
220 |
Staff quarters: |
221 |
1.Electrical line checking & servicing. |
222 |
2.Electrical equipment checking & servicing. |
223 |
3.Earthing line checking & servicing. |
224 |
4.LA system checking & servicing. |
225 |
Earthing Pointing: |
226 |
1.All Farms Earthing point Cleaning, re-tightening. |
227 |
2.Earthing Ohms Checking & Reporting. |
228 |
3.All Earthing Point Pit Making & Checking. |
229 |
Office, Store, Godown & Others: |
230 |
1.Electrical line checking & servicing. |
231 |
Manure belt system. |
232 |
1.Control board servicing and checking & Modification (if-required). |
233 |
2.Manure belt Support Plate Remove. |
234 |
3.Manure belt Support Plate Clean. |
235 |
4.Manure belt Support Plate Resetting. |
237 |
manure belt Motor Clean & Polythene Rapping |
238 |
7.Gear unit servicing & Bearing Change. |
239 |
8.Gear unit servicing, washing and re-oiling. |
240 |
9.Manure belt Check & Repair. |
241 |
10.Manure belt Change. |
242 |
11.Manure belt roller check & repair. |
243 |
12.Manure belt Front roller color. |
244 |
13.Manure belt Support Plate remove,Cleaning & resetting. |
245 |
14.Manure belt Support Plate Color. |
246 |
15.Manure belt Support Plate resetting. |
247 |
Cross & vertical conveyor system |
248 |
1.Belt support flat bar checking. |
249 |
2.Cross & vertical Belt checking. |
250 |
3.Supporting Roller Checking & Changing. |
251 |
4.Return roller checking & changing. |
252 |
5.Roller bearing checking & changing. |
253 |
6.Dram Roller checking & changing. |
254 |
7.Motor Clean. |
255 |
8.Motor servicing and checking, |
256 |
9.Litter House Repairing. |
257 |
10.Earthing connection checking and re-Tightening. |
258 |
Cage system. |
259 |
1.Fastener Cage door Lock checking & changing. |
260 |
2.Cage door checking & changing. |
261 |
3.Connector Channel checking & changing. |
262 |
4.Bracket pom for 5mm Rod Checking & changing. |
263 |
5.Cage Separating Weir mash checking and Changing. |
264 |
Egg belt system. |
265 |
1.Egg belt Remove. |
266 |
2.Egg belt clean. |
267 |
3.Egg belt Dry & Rolling . |
268 |
4.Egg belt checking, changing. |
269 |
5.Egg belt Hanger Chaecking & Changing. |
270 |
6.Connector channel checking & changing. |
271 |
7.Egg belt roller checking. |
272 |
8.Motor Clean & Polithin Raping. |
273 |
9.Motor servicing and checking. |
274 |
10.Earthing connection checking and re-Tightening. |
275 |
Egg elevator System. |
276 |
1.Column Chain remove. |
277 |
2.Column Chain Checking & cleaning . |
278 |
3.Column Chain resetting. |
279 |
4.Column Chain Covered remove. |
280 |
5.Column Chain Covered Clean. |
281 |
6.Column Chain Covered Resetting. |
282 |
7.Stick Chain Support Plate Remove. |
283 |
8.Stick Chain Support Plate Clean. |
284 |
9.Roller brash Chain Remove. |
285 |
10.Roller brash Chain Clean. |
286 |
11.Roller brash Chain PVC Covered Remove. |
287 |
12.Roller brash Chain PVC Covered Clean. |
288 |
13.Stick chain remove. |
289 |
14.Egg Stick remove. |
290 |
15.Egg Stick Cleaning. |
291 |
16.Stick chain Checking, Cleaning. |
292 |
17.Stick chain resetting. |
293 |
18.Stick & Sleeve for rod conveyor Remove. |
294 |
19.Stick & Sleeve for rod conveyor Clean. |
295 |
20.Egg elevator Remove. |
296 |
21.Egg elevator clean. |
297 |
22.Egg elevator Resetting. |
298 |
23.Egg receiver remove & Cleaning , |
299 |
24.Egg receiver resetting, |
300 |
25.Egg Divider Remove & Clean. |
301 |
26.Egg Divider Re setting. |
302 |
27.Control board servicing and checking & Modification (if-required). |
303 |
28.Motor servicing and checking. |
304 |
29.Earthing connection checking and re-Tightening. |
305 |
30.Motor Clean & Polythene Rapping. |
306 |
Egg Counter |
307 |
1.Junction box power connection checking and Clean & Plastic Wrapping. |
308 |
2.Egg counter power connection checking and Cleaning . |
309 |
3.Egg divider alignment checking and cleaning . |
310 |
4.Egg counter relay power check and maintenance. |
311 |
5.Egg counting computer power connection check . |
312 |
6.Earthing connection check, clean and maintenance. |
313 |
7 Egg counter Clean & Plastic Wrapping. |
314 |
Moba paking. |
315 |
1.Accumulator, Infeed unit lubrication. |
316 |
2.Pin conveyor remove, checking, Cleaning & resetting. |
317 |
3.Packing conveyor remove, checking, Cleaning & resetting. |
318 |
4.Carrier remove, checking, Cleaning & resetting. |
319 |
5.Index pall pusher chain remove, checking, Cleaning & resetting . |
320 |
6.All chain lubrication remove, checking, Cleaning & resetting. |
321 |
7.All bearing and ring remove, checking, Cleaning & resetting. |
322 |
8.Rod head remove, checking, Cleaning & resetting. |
323 |
9.safety cover , checking, Cleaning & resetting. |
324 |
10.All electric wiring n connection checking and Cleaning . |
325 |
11.Chain tension checking and adjustment . |
326 |
12.Tray Timing adjustment . |
327 |
13.Vibrator functioning checking & maintenance. |
328 |
14.Egg missing & breakage control check points Maintenance. |
329 |
15.Packing line checking & adjust . |
330 |
16.Clutch cleaning & resetting. |
331 |
17.Ribbon & liver checking & adjustment . |
332 |
18.MOBA Gear box & chain checking & maintenance. |
333 |
19.Take way conveyor cleaning & maintenance. |
334 |
20.Infeed unit checking, cleaning & adjustment . |
335 |
21.Transfer unit cleaning ,checking & adjustment. |
336 |
22.Culling time thoroughly maintenance . |
337 |
23.Carrier system checking , Cleaning & Maintenance. |
338 |
24.Motor servicing and checking. |
339 |
25.Earthing connection checking and re-Tightening. |
340 |
Facco Conveyor, |
341 |
1.Egg conveyor checking & cleaning. |
342 |
2.Egg conveyor maintenance. |
343 |
3.Counter weight checking and cleaning. |
344 |
4.Chain sprocket checking cleaning and changing. |
345 |
5.Bearing checking,cleaning and lubrication. |
346 |
6.Drive unit checking and cleaning. |
347 |
7.Gear oil level checking and cleaning. |
348 |
8.Gear oil changing checking and cleaning. |
349 |
9..Motor servicing and burnishing. |
350 |
10.Electrical wiring checking and cleaning. |
351 |
11.Control board checking and cleaning. |
352 |
12.Earthen connection checking. |
353 |
13.Running wheel cleaning & checking. |
354 |
14.Controlling board checking & cleaning. |
355 |
15.Guide checking, cleaning & maintenance. |
356 |
16.Egg way chain system checking, cleaning. |
357 |
17.Sensor checking & cleaning |
358 |
18.Intermediate reduce guide checking, cleaning & maintenance. |
359 |
19.Egg way oiler system checking ,cleaning & Maintenance. |
360 |
20.Intermediate runner unit checking, cleaning & Maintenance. |
361 |
21.Plastic profile checking, cleaning and Maintenance. |
362 |
22.Motor servicing and checking. |
363 |
23.Earthing connection checking and re-Tightening. |
364 |
Central Alarm System Checking . |
365 |
1.Control board servicing & checking & Modification (if required). |
366 |
2.Electrical line servicing,checking and Repairing. |
367 |
3.Battery servicing and checking. |
368 |
4.Horn and flash light servicing and checking. |
369 |
5.Earthing line servicing & checking. |
370 |
Climate Control System (Viper Board) |
371 |
Connection Checking & Cable Marking. |
372 |
Cable Connection Take out & Key Board Viper Open. |
373 |
Viper Touch Setting & All Cable Re-Connection. |